SAIER  03Sin título-1SAIER  17SAIER  16SAIER  18SAIER  20SAIER  19SAIER  21PLANTES-imágenes-4PLANTES-imágenes-3PLANTES-imágenes-2PLANTES-imágenes-1PLANTES-imágenes-0SAIER  04SAIER  12SAIER  06SAIER  13SAIER  08SAIER  14SAIER  09SAIER  24SAIER  25SAIER  26SAIER  30SAIER  34SAIER  35SAIER  01secc 2secc 1saier-gif-normal-calidad

Saier

Architects: Flexo Arquitectura
Client: Public. City Council of Barcelona. Open Competition First Prize.
Program: Public facility / SAIER (Service for Assistance to Immigrants, Emigrants, and Refugees)
Surface: 2.500 m²
Situation: Barcelona
Year: 2022-2024
Team: Luis Tresaco, Freddy Leon, Itziar Cabo, Alberto Espinosa, Bernat Ginot
Collaborators: Other Structures (structure), Albert Brufau (quantity surveyor), MTS, Societat Orgànica (sustainability), AIA Activitats Instal·lacions Arquitectòniques (engineering), José Hevia (photography)

The project involves the complete renovation of a 2,500 m² building in two phases to accommodate a SAIER (Servei d’Atenció a Immigrants, Emigrants i Refugiats), a municipal facility for immigrant and refugee services. The building is part of a larger complex housing various offices, and its façade and volume cannot be altered. Phase 1: entails a full interior refurbishment, while Phase 2: focuses on the building envelope.

DOMESTICITY AND STANDARDIZATION

This project aims to counteract the sterile, repetitive nature of a standard office building, adapting it to the needs of a SAIER—a center for welcoming and assisting migrants. The central question addressed is how to integrate domesticity into an office environment.

Geometric and material diversity are key strategies in achieving a welcoming atmosphere. The building includes various spaces for different teams (Red Cross, legal, social services) and multipurpose rooms, with layouts avoiding repetition. This is achieved through articulating elements that change in size, geometry, and material depending on floor location.

Materials mix artisanal elements (glazed tiles, textured plaster, terrazzo) with industrial ones (folded sheet metal, deployé mesh, linoleum). The assembly approach, closer to bricolage, enhances the individuality of the spaces.

REDUCING ENERGY DEMAND

The renovation also focuses on improving energy efficiency in a building from the 1980s. Insulation is upgraded, replacing outdated materials while maintaining the original design. New windows and thermo-reflective curtains ensure sun protection and cross-ventilation. The roof is upgraded with thermal insulation and a green roof to enhance thermal inertia.